The second orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 5538 sec from 15:44 hr IST on June 07, 2017.

Orbit Determination results from this LAM firing are:

Apogee X perigee height was changed to 35840 km X 10287 km.
Inclination is 7.02 deg.
Orbital period is 13 hr 58 min.

More ...