The first orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 116 sec from 14:03 hr IST on June 06, 2017.

Orbit Determination results from this LAM firing are:

Apogee X perigee height was changed to 35938 km X 172.77 km.
Inclination is 21.56 deg.
Orbital period is 10 hr 33 min.

More ...